Construction of the railway line No. 582 Czarnca – Włoszczowa (North)
The project refers to the construction of a new railway line No. 582 connecting Czarnca branch station with the Włoszczowa (North) station.
The need to build a new railway line results from the fact that it is currently not possible to enter from the railway line 61- from the direction of Kielce to line no. 4 (CMK) towards Warsaw and Łódź, without changing the direction of travel. The same situation applies to the reverse.
The planned project will include the construction of a railway line with a total length of 3.252 km (the length of the newly built section is 3.204 km) together with the necessary technical infrastructure and the reconstruction of the existing engineering facilities, traffic management (the SRK system), the catenary line, power engineering and telecommunications. The Czarnca - Włoszczowa (North) railway line connecting railway line No. 61 Kielce - Fosowskie with line No. 4 CMK Grodzisk Mazowiecki - Zawiercie is to constitute an additional element of a coherent system of railway connections between urban agglomerations in Poland.
Beneficiary: PKP SA POLISH RAILWAY LINES
Project value: 52 483 000,00 PLN
EU co-financing value: 36 372 932,68 PLN
Galeria zdjęć
Załączone pliki:
-
Construction of the railway line
Typ: jpg Rozmiar: 157.69 Kb Dodano: Pobrany: 925 razy